Planning a Winter Refit in Turkey: Timeline, Quotes and Supervision

How to plan a yard period on Turkey's south-west coast so it finishes on time and on budget: the work list, comparable quotations, contracts, supervision and handover.

By Mega Yacht Management Updated 3 min read

Why Refits Overrun

Most refits that run over time and budget do so for the same reasons: the scope was vague, quotations could not be compared, nobody checked the work as it went, and decisions were made in a rush at the end. Each of these can be prevented with planning — and planning has to start long before the yacht reaches the yard.

Turkey’s south-west coast, especially Marmaris, Fethiye and Bodrum, has many experienced yards and specialist trades. Owners can get excellent work at fair prices here. What makes the difference is how the job is specified and supervised.

The Timeline

  1. June–August: start the work list during the season, while the crew sees what needs attention.
  2. August–September: write the specification; ask yards and contractors for quotations; book the yard slot.
  3. October: compare quotations, agree the contract and the budget, order long-lead parts.
  4. November–March: the yard period itself, with regular inspections and reports.
  5. March–April: completion, sea trial, snag list, launch and recommissioning.

Yards are busiest in spring, just before the season. Starting late usually means fewer choices and higher prices.

Step 1: Write a Real Specification

A specification is a list of jobs written so that two yards would understand them the same way. “Service the engines” is not a specification; “replace raw-water pump impellers, heat exchanger service, valve clearance check per manufacturer schedule, report findings before further work” is. Build it from:

  • the defect list from the season,
  • planned maintenance falling due,
  • class, flag and insurance requirements,
  • the owner’s wishes and improvements.

Mark each item as essential, desirable or optional, so the budget can be adjusted without rewriting everything.

Step 2: Get Comparable Quotations

Send the same specification to every yard and contractor, and ask them to price it line by line. Then compare like with like: labour rates, materials, haul-out and storage, cradles, electricity, and what is excluded. The lowest total is not always the cheapest result — an offer that leaves out preparation work or assumes ideal conditions often grows later.

Step 3: Choose the Yard

  • Can the travel lift and the hard-standing take your yacht’s weight and beam?
  • Does the yard do the key work itself, or allow your chosen specialists?
  • Can the crew stay aboard, and is there covered space if needed?
  • What is the yard’s realistic availability for your dates?

See shipyard coordination and our Marmaris page.

Step 4: Agree the Contract

Put the scope, price, schedule and payment stages in writing. Agree how extra work will be handled: every extra priced and approved in writing before it starts. Agree what happens if the yard is late, and what documentation, warranties and invoices you will receive at the end.

Step 5: Supervise

Regular visits to the yard catch problems while they are cheap to fix. Good supervision means progress photos, a running list of open items, an updated cost forecast after each visit, and quick decisions when the yard finds something unexpected — which it usually does once the yacht is out of the water.

Step 6: Handover

  • sea trial covering every system that was worked on,
  • snag list agreed and closed before final payment,
  • invoices checked against the quotations and approved extras,
  • manuals, warranties and service reports collected and filed.

Budgeting Tips

  • keep a contingency for findings once the yacht is hauled out,
  • order long-lead parts early — shipping costs drop when there is no rush,
  • combine work that needs the same access (for example, everything below the waterline in one haul-out),
  • track costs weekly, not only at the end.

If you would like someone to run the project on your behalf, see refit management.

Frequently Asked Questions

How far ahead should a winter refit be planned?

Start the work list during the summer and book the yard by early autumn. For larger projects, start planning even earlier.

Why refit in Turkey?

Experienced yards and trades, competitive labour costs and a long winter season for work. With a clear specification and supervision, the quality can be excellent.

This guide is general information. Rules depend on the yacht's flag, ownership and use and change from time to time — ask us to confirm what applies to your yacht.